How To Build Double Pole Wooden Scaffolds 6




Basic Construction And Carpentry Techniques Home





Nailing The Toe Boards

16.Nail the toe boards. Toe boards must be approximately 4 inches (102 mm) in height above the platform. The toe board clearance between its low edge and the platform must not be more than 1/2 inch (13 mm). Toe boards keep materials from falling off the scaffold.

Figure 6








Custom Search









                                                                 Double Pole Wooden Scaffold Links

                                                     1.Double Pole Scaffold: Nail The Inside Uprights, Sill, Cleats & Ribbon.
                                                     2.Double Pole Scaffold: Nail The Intermediate Uprights.
                                                     3.Double Pole Scaffold: Nail The Outside Uprights, Sill, Ledger & Ribbon Boards.
                                                     4.Double Pole Scaffold: Nail Intermediate Uprights, Ledgers, Planks & Ribbons.
                                                     5.Double Pole Scaffold: Nail The Outside Diagonal Braces & Guard Rails.
                                                     6.Double Pole Scaffold: Nail The Toe Boards.
                                                     7.Double Pole Scaffold: Components Of A Double Pole Wooden Scaffold.
                                                     





Basic Construction And Carpentry Techniques Home
 
                                                    





                                                                                                          


Custom Search

Written and maintained by
Ronald Hunter
           
  All images and text are copyright Ronald Hunter 2005 to 2011
  All rights reserved
Top